“Library construction” includes, but is not limited to, the acquisition, construction, reconstruction, alteration, remodeling or enlargement of library buildings, the acquisition or installation of apparatus or equipment or the acquisition of land required as sites for such buildings, including land or rights in land needed to provide access to sites, and the grading or other improvements of such sites, land or rights in land, including the construction of sidewalks where authorized by law, the construction of any sewers or water mains needed to connect such buildings to any publicly-owned sewer system or water system. The following items are not considered to be included within the definition of “library construction:” Supplies, computers, debt service on loans, maintenance items and operating costs.
More specifically, needs assessments are reimbursable at 100%. In addition to general construction, the below are reimbursable at 50% -